Alcoa Pinjarra Residue Filtration Facility – Perth, Western Australia

WAY Electrical were engaged as a key partner in the EPC contract for the Alcoa Pinjarra Residue Filtration Facility. The Pinjarra facility design was based on the Kwinana facility which WAY completed the E&I installation for 2 years prior. Equipped with extensive experience of the facility WAY were able to add value and improve constructability and maintainability to the facility throughout the design and construction phases.

WAY Electrical was responsible for the complete site E&I installation of the facility which included a Filter Building with 6 Filter Presses to process the wet tailings and a material handling system comprising of Overland Conveyors, Trippers and a Mobile Stacking Bridge to stockpile the cake tailings.

Click on a thumbnail below to enlarge image

Alcoa Pinjarra Residue Filt Facility 1 (3) Alcoa Pinjarra Residue Filt Facility 1 (4) Alcoa Pinjarra Residue Filt Facility 1 (5) Alcoa Pinjarra Residue Filt Facility 1 (6) Alcoa Pinjarra Residue Filt Facility 1 (2) Alcoa Pinjarra Residue Filt Facility 1 (1)